Nagitsy Bridge Reconstruction

Nagitsy Bridge was replaced, due to a number of issues. One of the bigger issues was shoring, material was being moved due to the water current, which is natural and to fix this problem the bridge was moved  5 feet north to help realign the channel to its original location. Another issue was the bridge was narrow, so the bridge was widened to 34 feet to meet todays standards.